Schedule 1

Release Date, Reviews, System Requirements, News, and Guides

Game Overview

schedule 1 game details

Schedule I is an open‑world crime simulation video game where players build and expand a drug trafficking
empire in the fictional city of Hyland Point. The game combines business management, tactical strategy, and
dark humor as you grow from a small operator into an underworld tycoon.

Originally launched in **Early Access on March 24, 2025** for Windows, the game became a viral indie hit soon after release.

Game Details

Title Schedule I
Developer TVGS (Tyler’s Video Game Studio)
Publisher TVGS
Early Access Release March 24, 2025
Platforms Windows (PC)
Genre Open‑World, Simulation, Crime
Modes Single‑player, Multiplayer
Engine Unity

PC System Requirements

Minimum Recommended
OS Windows 10 (64‑bit) Windows 10 (64‑bit)
Processor Intel Core i5‑8400 / AMD Ryzen 5 2600 Intel Core i7‑10700K / AMD Ryzen 7 3700X
Memory 8 GB RAM 16 GB RAM
Graphics GeForce GTX 1060 6GB / Radeon RX 580 8GB GeForce RTX 2070 Super / Radeon RX 5700 XT
Storage 75 GB available space 75 GB available space (SSD recommended)

Review Scores

Source Score
User Reviews (PC) Very Positive (~98% positive early reports)

View on Steam
Metacritic Not yet listed / no aggregate score

Guides, How To’s, Locations, and Game Tips

Guides

Fully Automated Weed Factory Guide in Schedule 1

Make your entire farm setup automatic with these simple tips and tricks.

Franco

How to Use Drying Racks in Schedule 1

Here is a very quick guide on how to start upgrading your “herbs” in Schedule 1!

Franco

How To Get Botanists To Work On Drying Rack Auto In Schedule 1

Make them dry your product automatically for the best quality!

Andrés

How to Unlock All Dealers and Suppliers in Schedule 1

Here is how you can unlock every single dealer and supplier currently in the game!

Franco

Best Weed Mix In Schedule 1 For Low Level | $150 to $170 Per Bud

Start selling better drugs with this quick and simple weed mix you can try out.

Franco

How to Make Anti Gravity Effects in Schedule 1

Your drugs can now make people high in more ways than one if you follow this tip.

Franco

Best Bud Strain To Get Rich Early Game In Schedule 1

Trading the green away from some different type of green.

Andrés